Bandar Abbas Refinery Gasoline Production Increase Project
Title:

 

Bandar Abbas Refinery Gasoline Production Increase Project

 

Goals:
  • Increase  Gasoline production in the Refinery by 4.8 million litters per day
  • Construct new units and modify the process to minimize production heavy products
  • Install new storage tanks with total capacity of  2,830,000 Barrels.  

 

Investment:

 440 M €

 

Consultans:

 

PMC : Sorush Energi & PIDESCO (Iran)

 

Contractors:

 

  EPC Contractor :  PIDEC  (Iran)

 

Licensors:

 

Axens  ،  Prosernat

 

 Latest Status :

 

Detailed Design , Procurement and Construction in Progress

 

 

No. New Units Cap. Licensor
1
Heavy Naphta Hydrotreater
 25,000 (BPSD)  Axens
2 Continuous Catalyst Regeneration & Octanizing  25,000 (BPSD)  Axens
3 Light Naphta Hydrotreater  16,000 (BPSD)  Axens
4 Light Naphta Isomerization  16,000 (BPSD)  Axens
5 Gas Oil (Diesel) Hydrodesulphurization  50,000 (ton/days)  Axens
6 Sulfure Recovery  120 (ton/days) Prosernat 
7  Amine Gas Treating  200 (ton/days) Non-Licensed 
8  Sour Water Stripping  1.817 (ton/days)  Non-Licensed 

 

No. PRODUCT Existing Cap. BPSD New Cap BSPD
1 LPG

7,034

7,040

2 Gasoline

65,415

95,000 
3 Kerosene  35,860  15,575
4 Gas Oil  68,848  90,335
5 Fuel Oil

66,231

113,698

6 Sulfur (Ton per day)  130

250